Jim Hutchinson's Two Tomorrows The Happy Fox & Lady Belinda

Lady Belinda The Happy Fox Page List

 

The Establishment: Lizzy Bowes Lyons (The Queen Mum)

Glamis Castle Scotland. The Bowes Lyons ancestral home.
The Queen Mum was brought up, lived and died, surrounded by unctuous servants. She died aged 101 without ever learning how to dress herself, draw the curtains or make a bed.
Her father, the Earl of Strathmore, owned two castles and three hunting estates. Nobody really knows where the Queen Mum was born. Or indeed who she really was. After her first official appearance, on one of the Strathmore English estates, it was said, she was her father’s illegitimate child to a Glamis Castle housemaid – secretly adopted shortly after the Countess of Strathmore lost the child she was carrying. The story goes, the Countess took the pregnant maid to London to stop any gossip at Glamis.
The Earl was later fined seven-shilling-and-sixpence for not registering the birth (Not reporting a birth was a jailable offence but members of the Bar used to shoot on the Earl's estates). The Earl told the Court he was busy with the deer shoot when his wife went to London to have the baby. He assumed his wife's staff had registered the birth. According to the Earl she was born on his Hertfordshire estate. Parish Records refute this. Likewise the local Hertfordshire press, carrying little else but local events, births, deaths and marriages, makes no mention of the Countess’s happy event - which would have been front page news.

Friend’s of the Countess claimed the child was born in Bickerstaff Mansions, opposite Baker Street Station where the Earl had an apartment. Society gossips claimed the baby was born in a Harley Street Clinic. In both case’s it was alleged the Countess was holding the hand of the real mother - the maid - when the baby was born. The  maid signed her baby over to the Countess a month later, days before the maid and her husband sailed for America - paid off by the grateful Countess.
On one occasion the Queen Mum told a biographer she was born in a London ambulance. But that was reported as her way of saying she neither knew nor cared. Proving her actual birthplace is as unlikely now as proving her real mother. The royal family's re-writers have done their usual shredding-job of the Strathmore family correspondence. The truth was buried long before she was.
On the bright side. The truth about the real father's of Prince Andy Peado and Princess Edwina can now be found in your local library. see. The Royal Marriages, Smyth Gryphon. Lady Colin Campbell and Queen Elizabeth 2… not amused. Carol Publishing Group. Nicholas Davies and Prince Philip, a critical biography. Sidgwick & Jackson. John Parker & Elizabeth, Mandarin Books. Sarah Bradford,. and please use Google to learn the truth about so-called "royals". 

 

 

 

 

Nuclear Bubbly

 

As the French tried to stem the leak from a nuclear waste dump in the Champagne Region  
Her Majesty's Government proposed 4 more nuclear waste stations "expected to cost £2 Bn each".   The Guardian, January 7, 2008   

Her Majesty has ordered her government to build more, totally needless, new nuclear power stations. Her Majesty's, cousin George W. Bush has already allocated $13 BILLION TAX DOLLARS for "new nuclear build." The cousins will of course deny they mostly own and totally control the nuclear companies receiving an endless supply of the taxpayers billions. 

Twenty-odd-years-ago we were told Sizewell B would cost £450 Million. Her Majesty's Government then "revised" the cost to "no more than £950 Million." We now know Sizewell B cost the taxpayer £2.9 BILLION. We are expected to believe a nuclear power station that cost nearly £3 Billion 20-years ago can now be built for £2 Billion!  The Queen used Her Majesty's Energy Act, 2004, to make YOU the taxpayer and your children, grandchildren, great-grand-children & great-great-grandchildren etc., etc., responsible for the never-ending-costs incurred in handling and storing the, fatal cancer causing nuclear waste from Her Majesty's potential Chernobyl's.
Replacing Sellafield's storage facilities, alone, will make the £400 Billion Establishment Bank Bail-out look like bus fare. No other type of power production can incur these horrendous "back-end" never-ending-extra-costs.  added  2016, the price of Her Majesty's new Chernobyl's has risen to £24 Bn each!!!!

 

Michael Meacher 
Nuclear Power: "the mother of all white elephants."

"Bearing in mind, first, that taxpayers will pay more for nuclear electricity to cover decommissioning costs and will still have to pay for any shortfall which could run into billions; secondly, that taxpayers will have to pay the massive construction costs for storing hundreds of thousands of tonnes of highly radioactive waste; thirdly, that taxpayers will also be called on, if necessary, to guarantee a minimum price of carbon; and, fourthly, that the last round of nuclear build led to the country and taxpayers having to pay £5 billion to bail the nuclear industry out of bankruptcy, as well as £70 billion to deal with the waste, is not the whole nuclear project the mother of all white elephants?"

  Michael Meacher  Jan. 10, 2008.  Hansard
 
Michael Meacher should have said. "Prime Mouthpiece Gordon Brown needs to accept the fact that nuclear power is nothing more than a royal device to steal the taxpayers billions. Brown should tell Queen Lizzy her profits from her family's uranium mines and their uranium weapon sales are not as important as the future of Britain and the British. And its about time Queen Lizzy was arrested, tried and executed for Treason." 
Hutch    see  Nuclear Power? halfway down page 16   

top#tes                                      

 

t op#test  Added.  2016  

 Five years of research in Germany has shown how wind and solar can meet around 80% of electricity demand, with biogas and hydropower providing the balance.
 

The German combined-power plant has clearly demonstrated that solar PV and wind power are complementary. The only backup required is 17% biogas electricity and 5% storage power.
Together they provide a renewable electricity supply that is reliable 24/7, summer and winter at half construction cost of nuclear power. With no horrendous nuclear waste to pay for - for centuries to come.

Hinkley C, the first new nuclear power station for a generation, will cost £20 - 24 Billion.  
Since 2008 the price of building nuclear power stations has risen from £2 BILLION each to £24 BILLION each! Only the smack-head Crown Servant George Osborne could ignore the German nuclear phase-out and sanction another Fukushima (Target of Mass Destruction) to be built in Somerset, England. Only an inbred royal imbecile would order this criminal waste of taxpayers money.

 
A 50-year-old Nuclear Pool at Sellafield
The contents of this aging nuclear waste
pool will have to be closely guarded for the next one-thousand-years. Which means; the Public Purse will be raided to pay for building new, multi-£Billion storage pools, ponds and ancillary plant every fifty-odd-years starting any time now. The old pools, ponds & ancillary plant will then need to be encased in glass and buried, which means the Public Purse will again be looted to pay for building more, hideously expensive, nuclear waste encasing plants and building more & more hideously-expensive-land-eating-nuclear-waste-dumps to bury the used nuclear plant! Burying Britain's nuclear plant will cost the British taxpayers tens-of-billions more than any figure that Her Majesty's Government may quote.
Only an Enemy Of The British State could advocate building more potential Chernobyl's to produce more fatal cancer causing nuclear waste that will rob the British taxpayer of untold billions that should be used for pensions, hospitals, schools, dentists ect..

Solar, Wind, Sea and Fresh Water Power are the safest and by far the cheapest way forward. Anybody who say's Great Britain needs more nuclear power stations has been born far too soon. It will be decades before medical science can help these poor souls with a brain transplant.

 

Clean & Fast
The Rechargeable Car: Tesla Roadster, $109,000 

Tesla Motors achieved instant rock star status in 2006 when the company announced details about its Roadster, a screaming-fast, all-electric two-seater sports car built on the frame of the Lotus Elise. Since then, it’s been an heroic effort to revive the dream of a mass-produced zero-emissions electric car.
The black box that powers the
Tesla Roadster is five times the size of a normal car battery. It contains nearly 7,000 mass-commodity rechargeable lithium batteries giving the car a 200 mile range without charging.

The Teslar has the performance of a petrol powered car reaching 60 mph from standing in four seconds with a top speed of over 130 mph.


Cheap, clean road travel is being denied to the general public. The "powers that be" are refusing to fund battery driven cars and trucks. The same "powers that be" have no problem giving hundreds of billions of YOUR MONEY to the totally insane nuclear industry.

 

     August 2009  "Nuclear New Build"  The Usual  Progress

The much talked-up "nuclear new build" at Olkiluoto, Finland continues pouring other-peoples-money down the nuclear drain; the same way the cost of building Sizewell B went from £450 million to £2.9 BILLION. The Finnish Folly is on the same criminal path.
By May 2007 the project had stalled over engineering faults and the much publicized "final cost of €2.5 Billion" was revised-up to €4 Billion. 
By 2009, the "final cost" estimate had risen again to
6.6 Billion!
The estimate of €
6.6 Billion could easily double as the "nuclear new build" has now "failed its building standards inspection on over 1,000 separate counts!" And all these faults despite the "nuclear new build" being three-years behind its building schedule.

The French media revealed the other-peoples-money to finance the Finnish Folly came from €575 - €610  Million Export Credits from the hapless French taxpayer., Back-door State Aid (now being investigated by the EU) and dubiously cheap bank loans. Most of which could be re-called and thereby end the project. The Finnish taxpayer could end-up paying billion's of Euros for sweet Fanny Adams. Not by a very long chalk the first nuclear-new-build-multi-BILLION-fuck-up. see http://www.sxolsout.org.uk/96.html

 

Despite the sickly spin from Lord Mandy Mandleson the nuclear industry is in turmoil.
The vastly over budget and three year late Finnish nuclear reactor Olkiluoto 3 (once heralded as the start of a European nuclear 'renaissance') has become the nightmare Greenpeace predicted.
The record clearly shows Nuclear Power is incapable of delivering its promises to the energy market.
Nuclear Power is presently sucking up vast financial resources, which should be invested in safe renewable energy.
Nuclear power is insanely dangerous, permanently polluting and obviously proliferating nuclear weapons.
The nuclear apologists claim that "Olkiluoto-3 has proven nuclear power is cheap even without government subsidies" is only to be expected from an industry built on darn right lies.
The European Commission are investigating the French government's EUR570 million (US$725 million) loan guarantee, financing Olkiluoto 3. The loan agreement to Teollisuuden Voima Oyj (TVO)  is for the purchase of equipment from the French nuclear cowboy outfit AREVA. Separate complaints were filed in late 2004 (rightly) claiming the loan guarantee would illegally subsidize the project.
Olkiluoto-3 is a crucial deal for its constructor, Framatome ANP. It is the first European Pressure Reactor (EPR) design ever being built and a first nuclear project in a western country in a decade. Therefore the company was ready to fix the price - after securing at least €575 export credits from the French government. They agreed to construct the reactor for a fixed price of €3.2 Billion.
The figure used in earlier political debate about the project was €2.5 Billion. The reality is no-one can trust a word nuclear apologists say. The latest estimate of
6.6 Billion is by no means the end of the story.  www.olkiluoto.info  www.greenpeace.fi  

 

 


 

Senator McCain sealed his POW record until after his death.
These records detail his treasonous work for the commies.

 

Mr Bush's Legacy

The Domestic Terrorism Law made what any American "thinks" cause for imprisonment! The President can now decide that a person is thinking  terrorist thoughts!!! Presidential National Security Directive 51 signed by George W. Bush in 2007 gave the President dictatorial powers without seeking the approval of Congress.  The Department of Homeland Security can now place names on a No Fly list if the Director, Michael Chertoff, decides those names are "security risks." Chertoff is a member of the Federalist Society; a cabal of fanatic Globalists obsessed with destroying The Bill of Rights.

In the Orwellian America now unfolding all forms of travel will be denied to all but the rich thugs running the government. George W. Bush - who obviously hates us for our freedoms - has spent the last eight years ripping-up The Constitution.

What is happening to America today has absolutely nothing to do with foreign terrorists. Who, incidentally, had nothing to do with attacking America on 9/11.

 

Back Home Next

Page List